How long did that take you Joe ? using the cimex, not including the post vac,
I.m guessing with in a day
Geoff
If it had been straight forward and an empty offices I would have been ok.
As it was it was a secure unit, masses of work stations, 100 in one room, 80 in another, 70 in another.
Going under the footwells and under drawers on one side of the desk was a nightmare.
It took a good couple of days, one day I had to bring the Cimex down the stairs, do a small area so staff could get working when they came in at 8:30, then lug the Cimex back upstairs (oh for the big wheel conversion) so a bit higgly piggly.
I should have used the Cimex for the more open areas and a rotary for the footwells etc.
Then there were some carpeted corridors and 2 kitchen areas with "hard" floors which I used Solutions STS fluid and a black scrub pad from them also. Came up good.
I went in at a £1 cause I not been getting commercial (dont quote for a lot really) so I thought with 750sqyd even if I get a day rate I would be happy, and as I say the boss man increased it by 20% - he could see a good job was being done and he recognised there was some faffing about.