no, from before pump, through 100m and pole hose, wont take long at all. even if its 5 mins each night, and morning, if it saves freezing, happy days.
5 mins per pump and hose reel so about 10 mins each hose and reel per day
then 5 days a week then again by lets say 12 weeks of real cold weather at max (hope)
10 min per pump and reel times 5 equals 50 mins a week, times 12 weeks equals 600 mins per van (new pumps £80 ish) thats 10 wasted hours per van in twelve weeks
and thats on one hose reel and pump.
Just say there was 2 vans and 2 hoses and pumps in each
thats 2400 mins
if I counted anymore vans I would be seeing the doctor in the morning.
There has to be something or someone should come up with a failsafe way to cure this problem that is not time wasting or to costly.... Slumpbuster the floor is yours