This is an advertisementInterested In Advertising? | Contact Us Here
i have taken price into consideration and allowed for it in the provisions of the contract. marcus, the job is over 1500 sq metres in total, so this is just a niggle. balfour beatty have a total ladder ban on all sites now. i'm using a nifty for the outside. the windows aren't as bad as a normal builders clean as the glazers did a better job than usual but they did leave the sticker residue on the window. i suppose i could use a lightweight pole at an angle like alex does in his video, has anyone worked at this angle, the height would be reduced as i would be on the 3rd floor rather than the main hall floor.
alex,job got confirmed today. fetched forward to 15th nov. can u supply me with the modular 60ft with squeegee cones. would it be possible / necessary to make an adaptor for squeegee to the second section down to improve rigidity. also need a angle adaptor. i can travel down in needed. i am planning on videoing it as it seems to be an unusual thing i am trying. looking to forward to this challenge as long as i can get as rigid a pole as possiblecheers
thanx alex. i plan to use a wagtail flipper after scraping / oil flo ing with an unger clamp n brush n a bloke stood on roof outside with a mobile in hand telling me where i missed lol. good to know the modular poles are in stock.i'll ring up n order monday. cheers
sure if you got cscs, ipaf n pasma or a vistor cscs and insurance documents, can't see a problem if site satisfied