Well
I am still getting the ibcs and a transfer pump so will take it from there , at the moment it takes about an hour to fill one 650
litre tank from the tap through the di, if i fill into ibcs in the garage say 400 litres at a time, i can leave the tap on for 5 hours.
Then just fill the vans 5 mins at a time, it gets boring running up the garden every ten minutes to see if the van is full yet.
Also when the lads run out of water, they have to come back tofill up and wait at least half an hour whilst they get an extra half a tank,
so i will save a lot of time and money just getting the ibcs and transfer pump and hose.
I already run twin DI's, I am yet to see if dowex lasts any longer.
I have never noticed any difference , Is there any proof ?
I know the colour change resin doesnt last long so ditched that filter system a cople of months back,
Dave