The pics on here dont do the builings justice, its a lot of work. The horizontal frames are going to be a pain possible causing drips so the panes need doing in rows and left a bit to drip. Maybe need two sizes of brushes 12" for the horizontals an a bigger one for the large areas. Going to need a lot of water. maybe it could be split up over a couple of weeks with interim payments.