If they are bad i do mine in about 1m sections, that way most of the time it brakes up & flows along the getter with the water flow.
I can do a 4 bed detactched house in less than an hour start to finish.
Macc
is this the insides and outsides
what about fascia and soffit etc etc
how long to do them ?? ? ?
as ive been looking at a PW lance and all the stuff, i made a post about it a few weeks ago, still not brought it yet,
Hi Matt.
Sorry for the delay. That's all the gutters inside. I use wfp for doing all the outsides,
It then takes me 2-3 hrs to do all the outsides, gutters, fascias, windows, doors & garrage door.
So all together about 4hrs but i do a pukka job.
Macc