Just out of interest , how many of you would have used the same methods that i did ?
As some of you are aware , i have the gutter vac , but on this job it would have been useless , the pitched roof was the full length of the building bar 2 metres at one side , no access was available from the other side , it was around 10 metres deep leading onto a steel corrugated shed roof of about 2 metres of depth , no vac even with carbon poles was usable .
The front of the building was a chore for a vac too , balcony one side and pitched tile roof to the other , the angles for the vac poles would have been horrendous for the human back !
OK , Scaffold would then be the only other safest option , a little bit uncalled for me thinks !
So come on then , would you have done as i did , honest answers please !
Rich