I started work at 7.20 am, it was -3.5 C according to the thermometer. It was a shop signage, porch, windows, inside and out. Everything froze on the signs and porch, but the windows were fine (I did those trad), and it was £50. I just gritted everywhere, compliments of the grit bin just down the street from where I live.
Then I tradded another shop inside and out at £16 (just a small job, but they wanted the snow they'd sprayed on removed, since it looked a mess (it was).
The modular pole I used froze solid; I couldn't separate it, but the jobs done.
I'm now considering whether I should use ladders for the rest of the day or the pole; it seems to be warming up but it's still -1C.
I think I'm going to opt for ladders.