Hi Guys,
I recently brought a 2nd hand WFP system that required an RO unit.
I plumped for a 400 GPD with 2 booster pumps.
i worked out that it should take around 4 hrs to fill a 250 ltr tank, BUT - it is taking over 6 hours.
i have checked with the supplier and all he could come up with is that it has a small DI unit - reducing the pipework from 3/8 to 1/4 " diameter.
but is sure its running at the correct rate as was tested and run before shipping.
Does this fill time sound good - or as i suspect its slow - at the moment my workload for WFP is reasonably light so 250 ltrs is just enough per day.
Have i made a boob with this ??
all help and advice gratefully received
Darran