Gary
Thanks for that - that was a bit of a bu*ger - that job. We both said the same.
If you are doing that again in the future on either site you definately want to be looking at 4 days for TWO pressure washing, those plinths on the second site took us from 09.30 - 12.30 approx and we needed to use about 100 metres of hose on the one furthest from the gate and we had to find a fill up point on site and they took about 1500 litres of water. (thats with two large 15 litres per minute pressure washers)
We never touched any of the green walkways round the plinths so they look really bad now!!!!
Good little contact to have that one. I hope that it develops for you and that they keep you really busy.
Have a good week and I will catch up with you next week
Rob