hi there,
we are involved in a contract in Surrey, and one access method being considered is rope access.
the basics so far are approx 100ft up, no certified anchorage at roof line, working height is roofline and dropping down approx 3ft, cleaning a vertical concrete panel, then re positioning to next work area.
anybody with relevant experience, operatives, please respond or pm me. This does have the possibility of other work, we however will remain the main contractor.
this work will take place in december.
cherry picker access not possible.
regards
martin