I'm working tomorrow. I've a small, mostly real leaded windowed hotel to do outside with WFP
and inside by hand-bashing
.
I normally do them at the end of each calandar month, but they've asked me to do them prior to Christmas; they're really busy and want the place looking nice.
I'm not happy about it mind. I normally get Wor Lass to do the insides while I do the outs, but she's off work till January the something!!!!