Well, the main and aircon radiators are fitted and the new fans. Can't get the Aircon one recharged yet but the main one seems ok with coolant added.
Fitted a new water pump and auxiliary belt as the front was off.
Temperature gauge doesn't hit 90 degrees on idle so can't check if the new fans kick in yet.
The replacement headlight is in and working.
The front cosmetic bumper and grille didn't arrive from Yorkshire. Some nonsense about the carrier (Evri) saying it was too big so refund agreed.
But luckily there was one off an i800 people carrier in Lydney so I collected it this afternoon and it is temporarily fitted to allow us to align the wings, bonnet etc.
Looking hopeful as the bodywork guy can spray it white in a couple of weeks but hopefully ready to MOT by the end of next week.
Fingers crossed.
Well. A bit longer than anticipated by a week and four days.
I decided to re-do the back - as in removing, repainting and replacing tank frame, rotten plywood floor (covered in rubber), kurusting any surface rust, priming, Protectakote UVR and putting in trays to catch water.
Original 650L tank and pumps re-used. Pumps re-sited.
New plywood top and re used insulation.
Passed MOT today. So insurance valid again.
Back to work with it tomorrow...
Aircon to be recharged next week.