I'm trying to install my new S2 controller. I run twin 4040 RO with 20" carbon and sediment filters and Clarke booster pump.1. Where is solenoid valve fitted?After the prefilter but before the ro2. Do I leave the manual valve fitted to the waste of my RO full open or in the position for producing pure?Yes indeed - the S2 is not a auto- flush system so relies your existing manual flush valve. 3. Any other helpful tips?Use a 20mm hole saw to drill the hole for the tank float - this is recommended to be fitted 75mm down from top of the tank.Thanks in advance for any help.CheersRich