Just spoke o Graham. He did the job himself with the Cimex.
He used a combination of nylon floor brushes and bonnets on the Cimex.
Last time it was done we used pads but he had to run 50m extension to the room this time and the machine was labouring slightly so possibly not enough power getting to the machine.
Took him 3 hours including travel (20 mins each way)