I have had a very funny time recently. I have had 3 enquiries in the last month to quote for schools.(3 sites for 1) a very large single site and today another large one. The problem is that schools all want doing at the same time so i have had to turn my back on the 3 siter and am currently wondering if to do the same with the very large one. before i do, anyone think of any way that i could logistically cover the problem?