Quite windy in Sussex but I just stuck to one floor above ground and ground floor work. Came a cropper yesterday though. I had a big commercial job on Sunday. It was subcontract. It was right on the edge of what I'm comfortable with for 55ft work. I felt under a bit of pressure from the contractor to complete. If I hadn't felt under pressure, I would have deferred the exposed part of the job till next weekend. I ignored my gut feeling and ended up losing control and snapped a number 3 section of the 48ft Xtreme pole. Fortunately, I had already decided to keep my old SL2 for emergency back up. As I was about to drop down a floor anyway, I continued without problem.
Lesson learned. No matter what the pressure applied from elsewhere, follow your gut. I should know better and was a bit annoyed with myself. It won't be happening again. If the customer won't pay until completion, not my problem. My pay gets delayed too but rather that than take the risk.