This week I have got 2 schools to clean which will take me and my old man 4 days to complete. Here is my first day for you all to see.
Started at 8am and it was absolutely bucketing in down
The boys from the southwest should know what I mean; it was the heaviest rain I have ever worked in.
Dad working hard in the light drizzle
He was not a happy bunny this morning.
This is a pic of the rain it was like a monsoon (not sure how this will come out)
complete view of the last couple of pics. sorry about the bad light but a nice big Black cloud came over at this point and dumped even heavier rain on us
Time is now 1130am and we are both soaked right through to the bone, not even our water proofs kept the rain out. So we went home to warm up change our clothes have some lunch and put the system back on fill.
1230pm finished lunch managed to get a 100 litters in the tank.
This is the highest part of the school which is 40ft
Then on to this ram shacked annexe with lovely flaky paint.
Did not like doing this side of the annexe cos they were demolishing a building behind us which was a bit to close for comfort.
Last bit of the day. We had to do this by hand cos we ran out of water.
All done. time is now 415pm time to go home.
That is about 75% of the school done back tomorrow at 8 to finish the rest off!
We used 750 litters of water.
I will put Part 2 up tomorrow afternoon
Stuart
SAJ Window Cleaners Ltd