Hi all, I have just been to look at a job that is basically a side of a building which is 50/50 Brickwork/Steel Sheet.
The problem is that it is 70m in length by 8m High.
How do I go about reaching the top half?
Cherry Picker is my only thought, but I know nothing about this stuff! and the Health & Safety of this firm is VERY tight. Will I need trainig/certification etc?
Any help please ...
Phil