My first day with wfp, yipeee.
I have been waiting nearly a year for this, I took my wife as I usually do and she did downstairs trad. I got to my first house, unwound loads of pipe but my hosereel had warpped so just doing that was tough. I go around the back of the house and discover that I was a foot short of pipe, I put everything down went back to the van to unreel another foot of hose, Knocked over a plant pot and looked up at her windows only to discover all her windows are open so I tried closing them with my pole then the house alarm goes off, all eyes on me! my wife then comes around the corner and says " ive finished the backs " and I haven't even started.
Im confident that it will work out happily ever after, but what a struggle it was, it took me 1hr 30m to do 2 houses, with my wife helping me. Having said that I am using a 22ft universal pole to do first storey, my idea was get the largest pole that I can do everything with and then I can get a smaller one later.
moral of the story; don't buy cheap by the best that you can afford.
My customers where happy with the job though, to me that is what counts.
Any suggestions on making wfp life easier will be really gratefully excepted
Lee