Im with Mike, I have been caught out by pricing to what I think a customer would pay as opposed to time taken on small jobs.
If you are a barrow set up then it takes about 20 mins to unload gear, fill tank, warm engine, put on waterproofs etc and about 20 mins to disconnect, break down gear, coil hose and reload. So that's 40 minutes before you even clean your first square metre.