Should have the other van back by the weekend, all manuals, wiring diagrams, water flow charts, spare parts needed etc sourced, machine been stripped and cleaned, frame been repainted, engine ok, blower ok (been painted for protection from rust) heat exchanger had a small hole - now repaired, tested and works perfect, all parts been cleaned and repainted where needed, wiring been checked and small diode been purchased from US and fitted, waste tank, filters etc been cleaned out, auto pump-out cleaned out, waste tank 2" gate valve replaced, wiring checked and tested for refitting, couple of hoses replaced, all fitting changed at front of machine - just in case, got new solonoid, new pressure regulator valve, heat temp sensor - just in case, exhaust repainted, new belts etc - just waiting for the van, chomping at the bitt as cant build outside of the van as too heavy...........
You did ask