Today im preparing for monday so i can have a day off tommorrow away from wfp as im driving my girlfriend mad!!
so here goes:
ill be purifying 300L WATER(DI ONLY)this afternoon
Im making sure i only carry what i need in the van!(pole/trolley/water/trad gear/small DI)
im going to add another 10m of extension hose(5mm)on back of trolley.
all my round is getting switched over to wfp from monday bar a block of granny flats and a few odd accounts here and there(ali/oxidised/flakey painted windows).
when i say ill be changing everything over i mean tops only on run of the mill stuff and fully wfp on commercial/large country houses.also some big upvc conservatories will be wfp from the start!
ive also got a small toolbox with hose connectors/tape/knife/glue/screwdrivers/pliers etc.
another question if i purify my water this afternoon will is still be 000 on monday morning?
then i can relax tommorrow before the big day monday!(girlfriend will have me doing the garden! :
)
thanks for all the help and support guys!
best wishes to you all
dazmond