cheers guys!glad its goin so well for you tosh!!
normally everything runs pretty smoothly for me so i was due a bit of bad luck!hopefully ill be back at it soon!its frustrating not being able to earn!
but im looking forward to the next 6 months by which ill have my wfp set up and ill have done a few months at it!i dont think itll take that much getting used to as ive been using extension poles day in /day out for years!also i use a wfp (on custys outside tap)for conny roofs/fascias/soffits and the like!ive also been using the unger pole with a big heavy brush on it so anything else will probably feel great to use!
ive primed all my custys.i have letters for some of em printed out.ive changed over to gg3 a few months ago and ill be cleaning the dreaded top frames on most of my upper windows the clean before wfp(ive already cleaned some with a damp microfibre)so im well prepared!
ill be doing my first cleans in august(at the latest)and im goin to trad the downstairs for now apart from the odd big conny/georgian/leaded and gradually introduce it on most of my downstairs work over time
i know which windows are oxidized as ive been testing them!also the odd flakey wooden windows to be careful
with! :
.im certainly not going to stand round all day rinsing them thats for sure!